From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Occupied Territory

John Hearne explains how truly low energy buildings can succeed or fail depending on how they engage with their occupants.
John Hearne explains how truly low energy buildings can succeed or fail depending on how they engage with their occupants.

Oil alternatives

Oil alternatives
With oil prices remaining at ominously high levels in spite of sluggish economic growth figures and efforts by the International Energy Agency to release additional capacity, Ireland must act fast to cut oil usage. Why then, has the government withdrawn grants for renewables while continuing to subsidise oil and gas boilers?

Public good

Until recently the York Street flats had been a living legacy of failed past approaches to social housing – a slum of mainly north-facing flats dating from Victorian times, and poorly rebuilt in the year Ireland became a republic, 1949. John Hearne visited the recently redeveloped York Street and found a thoroughly sustainable set of buildings that should inspire thoughts of future progress rather than past failings.

Creature comforts

DRUMSHAMBO VETERINARY OFFICE MERGES ARCHITECTURE AND ENVIRONMENT
Not only does the new OPW-designed district veterinary office in Drumshanbo Co. Leitrim place strong emphasis on natural ventilation and lighting, it rests comfortably in the rural landscape and boats commendable green features too. Lenny Antonelli reports

Peak timing

Peak timing
As the organisation entrusted by OECD countries to predict future global energy supplies, the International Energy Agency’s projections have significant impact on energy policy around the world. IEA officials recently told The Guardian that the organisation’s figures on oil supply had been inflated and that oil peak is happening. Richard Douthwaite assesses the fall out

Energy Labels

0209energyratingtitle.jpg
As Construct Ireland goes to press, the construction industry awaits Ministers Dick Roche and Noel Dempsey to sign off the long overdue timetable for implementing the Energy Performance of Buildings Directive, a piece of legislation set to make energy performance a key factor in property sales. But can Ireland train up enough auditors to label buildings by January 2006?

Sustainable Sewage

0301-douthwaitetitle.jpg
There’s rather more to designing a sustainable building than specifying low-embodied energy materials and making sure it will require little energy and maintenance in use. Low water demand and the ability to get the nutrients discharged in the sewage back to the land are important too.

Breaking the mould - part I

Ill-considered attempts to upgrade a building’s thermal performance can not only fail to save energy, but can also create serious problems for occupant health and building structure alike. Leading green designer Joseph Little of Joseph Little Architects investigates the particular problems associated with dry-lining single-leaf concrete block walls

Heaven sent

Heaven Sent
When it comes to redeveloping old buildings, green designers face two choices: replace existing structures with modern, energy efficient buildings or refurbish and avoid the embodied energy and waste of demolition and new construction. Lenny Antonelli visited a redeveloped convent in Booterstown, County Dublin that combines the best of both approaches.

Access All Areas

0204disacctitle.jpg
A little foresight at the design stage can go a long way in determining a building’s success. If a building’s design fails to take into consideration the needs of any potential occupants and users, the risk of the need for corrective work, often at considerable cost, is greatly increased.
Construct Ireland’s Architecture Correspondent Lauren Kapusta reports