Super E

Marie Stamp, Senior Trade Commissioner at the Canadian Embassy, Dublin, discusses the merits of Super E home build.
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!

Marie Stamp, Senior Trade Commissioner at the Canadian Embassy, Dublin, discusses the merits of Super E home build.


Adding to the list of developers aiming to deliver energy efficient housing, Cronan Nagle Construction are currently on site with 188 highly insulated, airtight homes in Ennis, co. Clare. The development, which also incorporates heat recovery ventilation and condensing gas boilers is surpassing the thermal requirements of Building Regulations by up to 45%, as John Hearne discovers.

Construct Ireland’s John Hearne discovers a low energy, low carbon house being built in Galway which is achieving sustainable results whilst not jarring with aesthetic conventions.
Architect Paul Leech explains why the new Navan Credit Union is arguably Ireland’s most innovative sustainable building to date, and outlines his hopes that the experience gained from this project can help the construction industry to realise sustainable building in Ireland.

The need to reduce CO2 emissions and energy consumption from buildings has never been more immediate. There is a growing consensus that we must reduce our dependence on rapidly depleting, carbon intensive fossil fuels, which, amongst other things, will involve overhauling how buildings are designed, constructed and used.

Ireland has been waiting for a green procurement plan in the public sector for two years. Jason Walsh looks at what the plan should include and why it is needed, now more than ever, and with sustainable building at its core.

In light of the failure of AER 5 and the widespread pessimism in the wind industry regarding converting AER 6 contracts into operating wind farms, we asked the six main political parties what their proposals are for the development of an Irish wind industry.


A log bungalow in rural Meath has been extended and given a total energy upgrade – and wood is at the heart of the renovation, with a timber frame extension and external insulation system along with a fresh log finish.
Words: Lenny Antonelli