From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Heavy electricity

Heavy Electricity
SEAI recently proposed a series of changes to Deap — the software tool used to calculate BERs — including a reduction in its primary energy factor. But while this will benefit electrically-powered heating devices, some in the industry still feel systems such as heat pumps are disadvantaged by Deap and the BER system

Malahide tennis club

Malahide Tennis Club
High levels of external insulation, abundant natural light and a minimalist approach to ventilation are ensuring that Malahide Lawn Tennis and Croquet Club is as green as its courts

Sustainable Sewage

0301-douthwaitetitle.jpg
There’s rather more to designing a sustainable building than specifying low-embodied energy materials and making sure it will require little energy and maintenance in use. Low water demand and the ability to get the nutrients discharged in the sewage back to the land are important too.

Papered Over

Richard Douthwaite reveals that oil and gas peak are barely mentioned in the Government's recent energy Green Paper.
Richard Douthwaite reveals that oil and gas peak are barely mentioned in the Government's recent energy Green Paper.

A room with a view

Room with a view
Nowhere demonstrates the need for a high-performance building envelope quite like a coastal site. John Hearne visited a cutting edge timber frame house overlooking Sligo Bay that was designed to achieve a highly insulated, air-tight and low embodied energy envelope whilst making the most of the spectacular vista.

Greening public procurement

Greening public procurement
Ireland has been waiting for a green procurement plan in the public sector for two years. Jason Walsh looks at what the plan should include and why it is needed, now more than ever, and with sustainable building at its core.

Caveat Emptor

0208caveattitle.jpg
Construct Ireland Journalist Frank Coles investigates the impact posed by the Energy Performance of Buildings Directive

Tax incentives

0209blocktitle.jpg
Recent allegations that a single leaf timber frame development in Leitrim was forced to incorporate an outer layer of blockwork in spite of no such requirement in the Building Regulations or by the local authority in question suggests that something is seriously amiss, as Frank Coles explains.

Access All Areas

0204disacctitle.jpg
A little foresight at the design stage can go a long way in determining a building’s success. If a building’s design fails to take into consideration the needs of any potential occupants and users, the risk of the need for corrective work, often at considerable cost, is greatly increased.
Construct Ireland’s Architecture Correspondent Lauren Kapusta reports

The wind industry

0203politicgreentitle.gif
In light of the failure of AER 5 and the widespread pessimism in the wind industry regarding converting AER 6 contracts into operating wind farms, we asked the six main political parties what their proposals are for the development of an Irish wind industry.