Why Knott?

Lorna Kelly, of the Irish Timber Frame Manafacturers Association, takes a look at IrishTimber Frame
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!

Lorna Kelly, of the Irish Timber Frame Manafacturers Association, takes a look at IrishTimber Frame


Number Two Grand Canal Square office, completed in September 2009 and substantially occupied by law firm Byrne Wallace in August this year, set a landmark in commercial office development by combining world-class design with sustainability - reconciling the architecture of Daniel Libeskind with achieving both a Breeam Excellent rating and an A3 BER certificate. Paul Dunne, sustainability and M&E director for Arup, outlines some of the project’s history and its achievements
The Sun in Action by Paul Dykes, Marketing Manager of Sustainable Energy Ireland.

Conventional wisdom dictates that higher construction costs — for instance to reduce energy consumption and carbon emissions — would either squeeze developers’ profit margins or increase house prices. Tom Dunne, Head of DIT’s School of Real Estate and Construction Economics, reveals how misguided this view could be...
Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.
Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.

The introduction of smart metering later this year presents a great opportunity to engage Irish people en masse into substantially reducing their energy consumption, simply by showing them how much electricity they’re consuming, and how much the cost varies at different times of the day. However, as Richard Douthwaite warns, there is a real risk that smart metering may come in a form that benefits the electricity companies and not the end-user.
In the hands of the right architect, meeting the passive house standard needn’t involve compromising on design. Construct Ireland visited a recently certified passive house which shows that a seamless low energy architecture is possible

Unless greenhouse gas emissions from land are tackled, any efforts to reduce emissions from buildings may fall short in attempting to stave off the worst consequences of climate change. Richard Douthwaite explains how, with a little ingenuity, techniques can be applied to dramatically reduce land emissions whilst simultaneously providing new raw material streams and energy source

A sustainable energy project in north Tipperary has the potential to create a pioneering green community – buildings are getting energy makeovers, grants are available for renewables and the ecovillage at Cloughjordan is under construction. But getting householders in the area to go green is still proving a hard sell, as Lenny Antonelli reports