Warning
  • JUser: :_load: Unable to load user with ID: 222

From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Access All Areas

0204disacctitle.jpg
A little foresight at the design stage can go a long way in determining a building’s success. If a building’s design fails to take into consideration the needs of any potential occupants and users, the risk of the need for corrective work, often at considerable cost, is greatly increased.
Construct Ireland’s Architecture Correspondent Lauren Kapusta reports

Government Economic Ignorance

Landowners & Cement Producers Gain, Homebuyers & Taxpayers Suffer. By Richard Douthwaite

Sustainable Sewage

0301-douthwaitetitle.jpg
There’s rather more to designing a sustainable building than specifying low-embodied energy materials and making sure it will require little energy and maintenance in use. Low water demand and the ability to get the nutrients discharged in the sewage back to the land are important too.

A room with a view

Room with a view
Nowhere demonstrates the need for a high-performance building envelope quite like a coastal site. John Hearne visited a cutting edge timber frame house overlooking Sligo Bay that was designed to achieve a highly insulated, air-tight and low embodied energy envelope whilst making the most of the spectacular vista.

Modern Age

0309-modernagetitle.jpg
Creating the right comfort in buildings for elderly people involves ensuring a warm internal environment, which typically results in high energy consumption. John Hearne visited the new Castle Gardens Retirement Village as it approached completion and found a project that combines complimentary low energy technologies, materials and design to deliver high levels of comfort whilst also keeping running costs, energy consumption and carbon emissions low

Pay as you save

Pay as you save
In an ideal world every occupied building in Ireland would be energy upgraded to the highest standard, tapping into numerous benefits for the building occupant, the construction industry and society as a whole. Construct Ireland is calling for the introduction of pay as you save, a repayment model which offers the potential of making significant energy upgrade investments achievable in the vast majority of Irish buildings, as Jeff Colley reveals.

Box of Tricks

Wicklow bungalow gets low carbon modernist extension
A typical Irish bungalow built in the early 1990s has been transformed with a green-tinted extension built in the spirit of modernism. Jason Walsh visited Enniskerry, County Wicklow to see how the old and the new were integrated

Pre Form Precision

0305-preformprecisiontitle.jpg
The desire for better insulated, more environmentally friendly homes is driving ever more Irish self-builders to investigate alternatives to traditional block building. Jason Walsh visited a contemporary style factory-built timber frame house built in County Waterford in 2005.

Thin air

Thin Air
Independent integrated sustainable design consultant Xavier Dubuisson explains why heed must be paid to a recent study on the threats that misjudged energy upgrade work can pose to indoor air quality.

Q&A: Eaga

Ci asks EAGA
Energy upgrade specialists Eaga are responsible for technical training on SEAI’s Home Energy Saving scheme. Eaga technical manager Paul Wilson answers some key technical questions on the installation of boilers and heating arising from the recent contractor training.