New Build VS Old Build
A recent study undertaken by Dublin City Council could serve to shatter many commonly held misconceptions about how existing buildings can perform when compared to new build, even simply just in terms of running costs.
A recent study undertaken by Dublin City Council could serve to shatter many commonly held misconceptions about how existing buildings can perform when compared to new build, even simply just in terms of running costs.
The groundbreaking Gaelscoil an Eiscir Riada, Tullamore, Co. Offaly was the first project to comprehensively draw from the Department of Education & Science’s DART (Design Awareness Research and Technology) programme, delivering a sustainable research project on school design.
Ron and Collette Wardle started suffering ill health almost immediately after a sloppy energy upgrade. But reading a copy of Construct Ireland started a chain of events that led to the couple getting a brand new ventilation system — and seeing a marked improvement in their health.
Construct Ireland tracked down the busy director of Limerick Civil Trust to talk about the sterling work already done, current projects and to ponder the implications of recent FAS cutbacks.
Adding to the list of developers aiming to deliver energy efficient housing, Cronan Nagle Construction are currently on site with 188 highly insulated, airtight homes in Ennis, co. Clare. The development, which also incorporates heat recovery ventilation and condensing gas boilers is surpassing the thermal requirements of Building Regulations by up to 45%, as John Hearne discovers.
The Daintree Building is a mixed-use, sustainable urban building on Pleasant’s Place, just off Camden St. Dublin , writes Brian O’Brien of Solearth Architects. Conceived in 1999 it has been a long development process—but by late September Daintree should be open for business and the ever innovative Daintree (Paper Co) Ltd will have a new home, one appropriate to the delightfulness of their products and their focus on nature’s generosity for their raw materials.
Chris Croly from BDP outlines the low energy and renewable energy strategies used in University College Cork’s new Environmental Research Institute, a test bed for the design and performance of sustainable buildings, which is ideally suited to housing the 200+ environmental projects carried out by its researchers.
As the new-build sector grinds to a halt a window of opportunity has opened for builders, architects and other construction service providers – refurbishing Ireland’s existing housing stock. Jason Walsh visited an end-terrace house in inner city Dublin to see just how significant the improvements can be.
At Tom Heneghan’s new development in Dromard, Belmullet, Co. Mayo, it’s a case of sixteen units down, eleven to go as Construct Ireland goes to press. Exceeding the thermal performance requirements of the Building Regulations by some 60%, these houses incorporate a range of innovative and affordable sustainable building technologies which together deliver high comfort, low energy living, as John Hearne reveals.
Little did we know when campaigning for the Fingal energy standard in 2005-06 that Construct Ireland would have a direct impact on Ikea’s first Irish store. Driven by a combination of Fingal’s requirements and their own renewable energy policy, the Swedish retail giant has invested in the largest ground source heat pump installation in Ireland and the UK, along with a well-thought biomass system fed by an onsite waste stream and a host of other green measures, as John Hearne reports
Our ethos at Ecological Building Systems is to achieve 'Better Building' by adopting a 'Fabric First' approach to design.