Coillte Teoranta

The building is the first all timber office complex in Ireland. It covers almost 2,300m2 of floor space and provides accommodation for almost 100 staff working in a wide range of forestry related disciplines.

The building is the first all timber office complex in Ireland. It covers almost 2,300m2 of floor space and provides accommodation for almost 100 staff working in a wide range of forestry related disciplines.

With the building of a new house in Greystones, County Wicklow, Ireland has become only the third country to feature the work of Frank Lloyd Wright. Jason Walsh visited the site to see if Wright's designs might just represent the kind of thinking required in today's energy-conscious buildings.

Jason Walsh visited the Green Building, a pioneering sustainable development built in Dublin's Temple Bar in 1994, to find out how one of Ireland’s most ground breaking eco designs has been performing over the last decade.

In light of the current economic conditions, an increasing number of Irish people are turning away from buying new homes, instead deciding to make the most of what they’ve got by extending and refurbishing. Lenny Antonelli visited one such house nearing completion in Glasnevin that uses a combination of materials and techniques to aim for highly sustainable results.

In the second installment of a new feature on international green buildings, Lenny Antonelli takes a look at four innovative, sustainable and striking buildings from around the world.

Building a visitor centre at such an evocative site as the Cliffs of Moher, one of Ireland’s greatest tourist attractions must have been something of a challenge. By attempting to cater for visitors, the centre could so easily have ruined the rugged, barren landscape which makes people visit in the first place. John Hearne visited the new interpretive centre to discover a building which addresses this problem by becoming part of the landscape, whilst using eco technologies to reduce the building’s strain on the broader environment.

The rapidly growing public interest in sustainable building is finally starting to impact on property developers. Bill Quigley of Nutech Consultants describes an innovative 200 house development currently on site in Co. Cork where forward-thinking developers J & W Leahy Brothers have decided that the market is ready for low energy, low CO2 buildings.

A new development in the historic town of Thomastown, County Kilkenny brings the cutting edge of green innovation into a setting known for its medieval heritage. John Hearne visited the site, where a commitment to the environment is evident in sustainable design combined with everything from airtight detailing to technologies such as factory insulated timber frame, low energy windows, solar thermal, photovoltaic and heat recovery ventilation

Little did we know when campaigning for the Fingal energy standard in 2005-06 that Construct Ireland would have a direct impact on Ikea’s first Irish store. Driven by a combination of Fingal’s requirements and their own renewable energy policy, the Swedish retail giant has invested in the largest ground source heat pump installation in Ireland and the UK, along with a well-thought biomass system fed by an onsite waste stream and a host of other green measures, as John Hearne reports

At Tom Heneghan’s new development in Dromard, Belmullet, Co. Mayo, it’s a case of sixteen units down, eleven to go as Construct Ireland goes to press. Exceeding the thermal performance requirements of the Building Regulations by some 60%, these houses incorporate a range of innovative and affordable sustainable building technologies which together deliver high comfort, low energy living, as John Hearne reveals.
Our ethos at Ecological Building Systems is to achieve 'Better Building' by adopting a 'Fabric First' approach to design.