Case Studies

Past perfect

Past-Perfect
As the new-build sector grinds to a halt a window of opportunity has opened for builders, architects and other construction service providers – refurbishing Ireland’s existing housing stock. Jason Walsh visited an end-terrace house in inner city Dublin to see just how significant the improvements can be.

Hidden Depths

0303-hiddendepthstitle.jpg
Construct Ireland’s John Hearne discovers a low energy, low carbon house being built in Galway which is achieving sustainable results whilst not jarring with aesthetic conventions.

Ballymurrin House

0303-ballymurintitle.jpg
If achieving eco buildings is challenging for new build, it is doubly so for renovation projects. Philip & Delphine Geoghegan of iCon Architecture & Uban Design describe a low impact renovation that balances these apparent tensions with great success.

State of the Art

0207gallerytitle.jpg
Inside the Lewis Glucksman Eco Gallery, with John Burgess of Arup Consulting

Killeagh, Co. Cork

0302-killeaghtitle.jpg
The rapidly growing public interest in sustainable building is finally starting to impact on property developers. Bill Quigley of Nutech Consultants describes an innovative 200 house development currently on site in Co. Cork where forward-thinking developers J & W Leahy Brothers have decided that the market is ready for low energy, low CO2 buildings.

Botched Finglas upgrade

Botched Finglas Upgrade
Ron and Collette Wardle started suffering ill health almost immediately after a sloppy energy upgrade. But reading a copy of Construct Ireland started a chain of events that led to the couple getting a brand new ventilation system — and seeing a marked improvement in their health.

True to Form

0305-lowenergyICFtitle.jpg
Adding to the list of developers aiming to deliver energy efficient housing, Cronan Nagle Construction are currently on site with 188 highly insulated, airtight homes in Ennis, co. Clare. The development, which also incorporates heat recovery ventilation and condensing gas boilers is surpassing the thermal requirements of Building Regulations by up to 45%, as John Hearne discovers.

Healthy cottage upgraded

Cottage Upgrade
In 2005 Construct Ireland profiled the timber frame extension to Hannah and Martin Naughton’s Meath cottage. Five years later we’re returning to profile the upgrade of the original bungalow — a renovation that demonstrates how to detail dry lining without running the risk of mould growth

Coillte Teoranta

0208coilltetitle.jpg
The building is the first all timber office complex in Ireland. It covers almost 2,300m2 of floor space and provides accommodation for almost 100 staff working in a wide range of forestry related disciplines.

New Build VS Old Build

0206newvsoldtitle.jpg
A recent study undertaken by Dublin City Council could serve to shatter many commonly held misconceptions about how existing buildings can perform when compared to new build, even simply just in terms of running costs.

Marketplace + companies featured in this article

Ecological Building Systems

Our ethos at Ecological Building Systems is to achieve 'Better Building' by adopting a 'Fabric First' approach to design.