From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Bank on Expensive Oil

PROPERTY LENDING & A CHANGED ENERGY LANDSCAPE
World record oil prices are being shattered so regularly that breaking news stories on the matter seem cliché, with other fossil energy sources heading in the same direction. Richard Douthwaite describes the first significant signs that Irish banks may be starting to take the issue on board regarding property lending.

A-rated Cork eco home

A rated Cork
After a long struggle to build their home, Karen and Steve Ward finally got their wish — an energy efficient, timber frame house that boasts a palette of healthy and ecological materials and a fully renewable heating system.

Living without heating

The advent of central heating improved the comfort of life for countless Irish people over the past century, but as energy efficient building grows, some pioneering homeowners think they can live without it. What’s life like for them?

Oil and The Irish Economy

0210douthwaitetitle.jpg
In terms of 1972 money, oil prices averaged about six dollars a barrel between 1987 and 2000. Last October they reached $40. They are now around $50 a barrel which means that they are beginning to climb back into the territory which caused the global economy to crash in 1979/80.

Gimme shelter

Gimme Shelter
Designing a low energy building when you've got unlimited space is one thing – but what if you need to make your walls thin to maximise space on a small site in an architectural conservation area? Lenny Antonelli visited a new St Vincent De Paul sheltered housing project that fit a lot of sustainable features on to a small plot in Dublin's north inner city.

The Eco House

0212ecohousetitle.jpg
Recently sold by private tender for over e1.3 million, the ECO House in Shankill, Co. Dublin exceeded auctioneers expectations, an indicative example of the shift from public curiosity to eagerness to invest in contemporary sustainable building.

All systems go

0406-All-Systems-Go-SMALL.jpg
Some buildings, by their nature, tend to have larger energy requirements. Occupied around the clock, with occupants who feel the cold, nursing homes are a case in point. John Hearne visited a north Dublin building where a range of different sustainable technologies operate in tandem to deliver the residents’ heating and hot water requirements

Green giant

Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.

Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.

Easca

0307-eascatitle.gif
‘Interest in sustainable construction, both from private sector individuals and businesses and from the public sector has grown rapidly in the last couple of years. Unfortunately the ability of the industry to respond to this interest is under developed’ – Tom Woolley.

Passive assessment

Passive Assessment
Built in 2004, Tomás O’Leary's house in Wicklow was the first in the country to be certified by the Passive House Institute — but how would it fare when subjected to a BER assessment six years later?