From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Alive and well

Alive-And-Well
Designing sustainable buildings doesn’t always mean hi-tech solutions. From green roofs to living walls to constructed wetlands, sometimes it’s just a matter of embracing natural solutions. Lenny Antonelli investigates the emerging technologies and designs that use nature to improve the performance of buildings.

EPA

0203epatitle.gif
‘‘We have a body of extremely experienced and competent staff who will be able to hit the ground running”

Good form

0404-Good-Form-SMALL.jpg
If you are at all worried about keeping construction costs down and lengthening the useable lifespan of your building, it’s critical that energy performance is considered from the earliest stages of planning and design. John Hearne spoke to a number of leading Irish experts in sustainable design about following simple principles of orientation, form and layout to achieve substantial energy improvements for free

Passive dynamics

0308-passivedynamicstitle.jpg
For a building to truly be considered a passive house a vast range of criteria need to be met, as Niels Bjergstrom, founder of Zero-Carbon Solutions Ltd reveals.

Critical mass

Critical Mass
Thermal mass can significantly influence a building’s space heating requirement – in some cases the effect is to increase it, and in others to reduce it. Leading energy consultant Ciaran King of Emerald Energy explains how this occurs, and by describing an assessment of the topic, provides some rules of thumb regarding when thermal mass may be beneficial, and when it may be detrimental.

Central line

Sligo developer chooses bespoke centralised biomass heating system
Developers across Ireland are beginning to see the sense in shifting from individual heating systems to centralised energy production feeding into district heating networks. John Hearne visited a mixed-use scheme in Ballisodare, County Sligo, where a cutting edge biomass energy centre is providing a multitude of different buildings with energy from a green, secure source.

Harp attack

Harp Attack
The HARP database allows Building Energy Rating assessors to enter real performance data for heating appliances when calculating Building Energy Ratings rather than low default scores - but few renewable appliances are listed, and the industry appears confused and deterred by the application process. Lenny Antonelli investigates.

Fingal Commits

 

If you’re applying for planning permission to build in Cappagh, North Ballymun or Northwest Balbriggan, 30% of your heating must come from renewable energy, and your heating must be less than 50Kwh/m2 per annum—roughly twice the standard of most new homes.

BEMS - Building Energy Management Systems

0205bemstitle.jpg
Commercial, industrial and institutional buildings use a great deal of energy to ensure the comfort of the occupants and the efficient operation of their businesses. Building Energy Management Systems (BEMS) enable building owners to use this energy efficiently, as Sustainable Energy Ireland’s Chris Hughes explains

Green giant

Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.

Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.