From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Chernobyl Children’s Project

0203chernobyltitle.jpg
Construct Ireland spoke to Adi Roche to find out about the progress so far, and the need for continuing support.

Harp attack

Harp Attack
The HARP database allows Building Energy Rating assessors to enter real performance data for heating appliances when calculating Building Energy Ratings rather than low default scores - but few renewable appliances are listed, and the industry appears confused and deterred by the application process. Lenny Antonelli investigates.

Sustainable Housing

Can sustainability and social housing be married in one development? Construct Ireland investigates a ground breaking social housing project in West Cork.

Peak timing

Peak timing
As the organisation entrusted by OECD countries to predict future global energy supplies, the International Energy Agency’s projections have significant impact on energy policy around the world. IEA officials recently told The Guardian that the organisation’s figures on oil supply had been inflated and that oil peak is happening. Richard Douthwaite assesses the fall out

Deconstruct Ireland

Deconstruct Ireland
The environmental impact of the built environment extends far beyond energy consumption and carbon emissions throughout a building’s intended lifespan. Architect and sustainable design consultant Sinéad Cullen of DW EcoCo & BE Architecture explains why there’s a need to design buildings that can be deconstructed rather than destroyed once they reach their end of life, and looks at the obstacles to be overcome to make this happen.

Static electricity

0404-Static-Electricity-SMALL.jpg
The announcement in 2007 of the introduction of Smart electricity metering led to widespread hope that Ireland could set a global example by empowering consumers to cut electricity use and generate their own renewable electricity. John Hearne investigates current progress on the initiative, and discovers signs that Ireland’s approach to smart metering could represent a missed opportunity.

Eco Equity

Eco Equity
Set in the shadow of Macgillycuddy's Reeks, Killorglin, County Kerry is a dramatic and rugged location best known as a tourist destination and home to Puck Fair. It’s also home, however, to one of Ireland’s most successful companies, FEXCO, which has opened its new low-energy corporate headquarters in the town.

The natural step

 The Natural Step
A framework for strategic sustainability is essential if we’re serious about greening the Irish built environment.
According to green architect Pat Barry, we should look no further than The Natural Step.

Dead Cert

0302-deadcerttitle.jpg
Everyone agrees that the standard of building materials must be maintained but is localised technical certification resulting in a death of innovative and environmentally friendly building products and systems reaching the Irish market? Construct Ireland's Jason Walsh & Jeff Colley investigate.

Measured efforts

How SEI’s pilot energy refurb initiative is shaping up
Earlier this year constructireland.ie broke the news of the introduction of the pilot Home Energy Saving Scheme, a new grant funding programme designed to stimulate the en masse refurbishment of Ireland’s poorly performing existing housing stock. John Hearne travelled to one of the pilot areas to see how the scheme is working on the ground, and discover how the scheme is developing.