Split level timber frame house overcomes steep site

Cork city split level timber frame house with passive solar design, rainwater harvesting, renewables & green material
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!

Cork city split level timber frame house with passive solar design, rainwater harvesting, renewables & green material

Four years ago the construction industry was focused on building big and fast — but at the same time, a small team was carefully and ecologically retrofitting a terraced Dublin house on a tight budget according to passive house principles.



In the fourth part of a series of articles on the condensation risks associated with insulating single lead dwellings, Joseph Little of Joseph Little Architects & Building Life Consultancy reveals serious problems with the approach taken by regulators, standards authorities and suppliers on the condensation risks associated with insulating single leaf walls.
Sustainable Energy Ireland was initially criticised by some quarters for the lack of vetting of renewable energy installers registered under the Greener Homes Scheme. However, the recent introduction of mandatory training for those on the register has also proven controversial, writes Lenny Antonelli.

Adding to the list of developers aiming to deliver energy efficient housing, Cronan Nagle Construction are currently on site with 188 highly insulated, airtight homes in Ennis, co. Clare. The development, which also incorporates heat recovery ventilation and condensing gas boilers is surpassing the thermal requirements of Building Regulations by up to 45%, as John Hearne discovers.
Construct Ireland tracked down the busy director of Limerick Civil Trust to talk about the sterling work already done, current projects and to ponder the implications of recent FAS cutbacks.